So I've been a little slack with the pictures as of late, so here are some pictures of our latest project on the farm. We are putting in a mini-indoor that is 30x72 with a two 20x10 stalls off the back of it (foaling stalls). We are also converting the three strands of electric fencing by the house to two rails and a middle strand of electric.
April 20th - Breaking Ground
April 22nd - Squaring up the location
April 23rd - Corner Posts
April 24th - Posts for the right wall
April 27th - Post for the left wall
April 29th - All posts in
May 24th - Walls going up
May 28th - More Walls
June 15th - Right wall almost done
June 20th - Both walls almost done
June 26th - Post and rail fencing started